Saturday, September 11, 2010

Loaded Truck




The first stage of our project is done. With the cedar boards ripped, beaded and coved, we head back to Bellingham with our truck loaded down also with a strongback (upon which we mount the stems and forms to put on the beaded and coved strips).

No comments: